Sweetwater River Restoration (Phase II)

Dates

Start Date
2008-01-01
End Date
2008-08-31

Summary

The restoration project constructed a low level dike, headwall, and head-gate at the mouth of the irrigation ditch to move the river back into its original channel. Phase II– The Sweetwater River jumped into an existing irrigation ditch creating a shortened braided channel (3,200 ft) and dewatering the historic single thread channel of 4,958 ft. The steepened channel created a head-cut in the main channel, causing channel incision and severe bank instability throughout the project area. The restoration project constructed a low level dike, headwall, and head-gate at the mouth of the irrigation ditch to move the river back into its original channel. Project completed August 2008. Approximately 12,100 ft of channel down stream was successfully [...]

Contacts

Data Owner :
WLCI Coordination Team

Project Extension

projectStatusCompleted

Map

Communities

  • Wyoming Landscape Conservation Initiative

Tags

Provenance

Item Actions

View Item as ...

Save Item as ...

View Item...